ADVISORY ON FAILURE OF ELECTION (ALUBIJID DISTRICT) – March 9, 2024

Good day to our beloved Member-Consumer-Owners of MORESCO-1, especially to the MCOs in District 8, ALUBIJID.

Following the deliberation of our Screening Committee for the Election of Representatives to the Board of Directors of our District 8 (ALUBIJID), scheduled for tomorrow, Saturday, MARCH 9, 2024, we inform you that no one has submitted their Letters of Intent to Run. Thus, we have not identified any Qualified Candidate to run and be elected as Board of Director – hence, this is declared as a FAILURE OF ELECTION.

The MORESCO-1 Screening Committee composed of members from the Management Committee of MORESCO-1 from the Engineering Services Department, Finance Services Department, and led by the Institutional Services Manager, the department mandated to oversee election-related activities in the Cooperative under the mandate of NEA Memo No. 2014-019 – 2014 Guidelines on the Conduct of EC District Election for Electric Cooperatives, Dated 01 July 2014, Section 13.2.2 stating “In no less than seven (7) days before the election, the Screening Committee shall prepare the duly certified candidates and officially inform all applicants accordingly.”

SINCE WE HAVE NO OPTION FOR AN ELECTION IN ACCORDANCE WITH THE APPROVED SCHEDULE OF DISTRICT ELECTION BY THE NATIONAL ELECTRIFICATION ADMINISTRATION (NEA), WE WILL SEND A PROPOSAL OR SUGGESTION REGARDING THE CONDUCT OF ANOTHER ELECTION SO THAT THE DISTRICT 8 CAN ELECT A DIRECTOR TO THE BOARD OF DIRECTORS OF MORESCO-1.

FOR NOW, WE WILL ONLY AWAIT THE DECISION OF NEA ON THE NEXT SCHEDULE OF ELECTIONS FOR ALUBIJD DISTRICT.

Thank you very much for your understanding.

ADVISORY ON FAILURE OF ELECTION (ALUBIJID DISTRICT) – MARCH 9, 2024

Maayong adlaw sa atong mga pinalanggang Miyembro-Konsumante-Tag-iya sa MORESCO-1 labi na gayud ang mga MCO sa Distrito sa ALUBIJID (DISTRICT 8).

Human sa pagtuki sa atong Screening Committee alang sa Piniliay nato sa Representante sa Hunta Direktiba sa atong District 8 (ALUBIJID) ugmang adlawa, Sabado, MARSO 9, 2024, kamo gipahibalo nga walay nag-sumiter sa ilang mga Letter of Intent to Run, mao nga wala kitay nakitang Qualified Candidate nga mudagan ug magpa pili isip Board of Director – – mao nga gideklara kini nga FAILURE OF ELECTION.

Ang MORESCO-1 Screening Committee nga gilangkuban sa mga miyembro sa Management Committee sa MORESCO-1 gikan sa Engineering Services Department, Finance Services Department ug gipanguluhan sa Institutional Services Manager, ang departamento nga maoy gi-mandato sa pagpadagan sa mga election-related activities sa Kooperatiba ubos sa mandato sa NEA Memo No. 2014-019 – 2014 Guidelines on the Conduct of EC District Election for Electric Cooperatives.” Dated 01 July 2014, Section 13.2.2 nga gaingun “In no less than seven (7) days before the election, the Screening Committee shall prepare the duly certified candidates and officially inform all applicants accordingly.”

TUNGUD KAY WALA MAN KITAY MAHIMO NGA ELECTION PINASUBAY SA NA-APROBAHAN NGA SCHEDULE OF DISTRICT ELECTION SA NATIONAL ELECTRIFICATION ADMINISTRATION (NEA), KAMI MAGPADALA NA USAB UG PROPOSAL O SUGYOT KABAHIN SA PAGPAHIGAYON SA USA NA USAB KA ELECTION ARUN MAKAPILI UG DIRECTOR ANG DISTRITO OTSO NGADTO SA HUNTA DIREKTIBA SA MORESCO-1.

SA PAGKA-KARUN, ANG ATO LAMANG PAABOTON MAO ANG DESISYON SA NEA SA SUNOD NGA SCHEDULE SA ELECTION SA DISTRITO SA ALUBIJID.

Daghang salamat sa inyong pagsabot.

Pahibalo gikan sa Institutional Services Department (ISD) sa MORESCO-1

POWER RATES UPDATE sa RESIDENTIAL CONSUMERS para sa Billing Month sa PEBRERO 2024 – – – – PHP10.8246 /KWH.

Bisan pa ug adunay pag-ubos sa variable cost sa pipila nato ka mga IPP Suppliers, adunay pagtaas sa Wholesale Electricity Spot Market (kun WESM, nga ang sangputanan mao usab ang pagsaka sa atong Generation Rate ngadto sa PHP0.4033/kWh

Bisan pa man sa pagtaas sa atong Generation rate, ang musunod adunay pagkunhod o pag-ubos.

1) System Loss Rate balor ug PhP 0.2486 /kWh

2) Transmission Rate balor ug PhP 0.2224 /kWh

Kini nga mga makanunayong kausaban mi resulta sa atong effective rate karung bulana ngadto sa PHP 10.7424 / kWh alang sa mga Residential nga konsumidor.

Sa kasamtangang bahin, kini ang taripa sa uban natong consumers:

LOW VOLTAGE CONSUMERS – Ang Low Voltage adunay kinatibuk’ang pag-taas ubos ug PhP 0.1015 matag KwH nga adunay effective rate balor ug Php 9.7712 / kWh.

(LOW VOLTAGE CONSUMERS are those whose electric connections are tapped into MORESCO-1’s secondary lines or those lines that come after the transformers. Low voltage lines carry a range of 240 to 480 volts of electricity. Few examples are small commercial, street lights, and some other public buildings.)

HIGH VOLTAGE CONSUMERS – Ang High Voltage adunay kinatibuk’ang pag-ubos balor ug PhP 0.0190 ug adunay effective rate balor ug PhP 8.9021/ kWh ug demand rate PhP 639.7216 / kW.

PALIHUG AYAW NA PAGLANGAN SA PAGBAYAD SA INYONG BINULAN NGA BALAYRONON SA KURYENTE, KAY ATO NANG GISUGDAN ANG ‘ONE MONTH DISCONNECTION POLICY.”

DAGHAN SALAMAT SA INYONG MAKANUNAYON PAGSUPORTA.