POWER RATES SA BULAN SA AGOSTO 2024 MI’KUNHOD GIKAN SA PHP 11.2568 /KWH NGADTO SA PHP 11.0246/KWH

PAHIBALO PARA SA MGA PINALANGGA NATONG MGA MEMBER-CONSUMER-OWNERS (MCOs).

ADUNAY PAG-UBOS SA BALOR UG PHP 0.2322 /kWh SA ATONG “POWER RATES” alang sa atong mga RESIDENTIAL CONSUMERS para sa Billing Month sa AGOSTO 2024 – – – – PHP 11.0246/KWH.

Hinungdan niini mao ang pag’ubos sa variable rates sa nga gisingil kanato sa atong mga IPPs, maong miubos usab ang Generation Rate bali ug PhP 0.1486 / KwH. 

Gawas sa pag-ubos sa Generation Rate, ang Transmission Rates miubos usab ug PHP 0.0633 apil na ang System Loss Rates uban nga miubos ug PHP 0.0053 KwH.

Sa laing bahin, ang Power Sector Assets and Liabilities Management Corporation o PSALM nag abiso sa MORESCO-1 nga undangon na ang pagpatong sa Universal Charge alang sa Missionary Electrification (UC-ME) subsidy alang sa Tuig 2013 ug 2014 nga nagkantidad ug PHP 0.0433/kWh sugud August 2024 nga billing period.

Kini nga mga makanunayong kausaban mi resulta sa atong effective rate karung bulan sa Agosto ngadto sa PHP 11.0246 / kWh alang sa mga Residential nga konsumidor.

—————————————————————————————

Sa kasamtangang bahin, kini ang taripa sa uban natong consumers:

LOW VOLTAGE CONSUMERS – Ang Low Voltage adunay kinatibuk’ang pag-ubos ug PHP0.2473 matag KwH nga adunay effective rate balor ug 10.0970 /KwH.

Ang LOW VOLTAGE CONSUMERS mao kadtong mga konektado sa kuryente nga gi-tap sa secondary lines sa MORESCO-1 o kadtong mga linya nga molabay human sa mga transformer. Ang mga linya sa low voltage nagdala og rango sa 240 hangtud 480 volts sa kuryente. Pipila sa mga ehemplo mao ang mga gamay nga komersyal, mga street light, ug uban pang mga pampublikong pasilidad.

————————————————————————————–

HIGH VOLTAGE CONSUMERS – Ang High Voltage adunay kinatibuk’ang pag-ubos balor ug PHP0.1655 ug adunay effective rate balor ug PHP 9.1827/KwH ug demand rate PhP 629.3392/ Kw (with VAT).

Ang HIGH VOLTAGE CONSUMERS mao kadtong mga gagamit nga ang ilang koneksyon sa kuryente gi-tap sa primary lines sa MORESCO-1 o kadtong mga linya nga molabay sa unahan sa transformer. Ang mga linya sa high voltage nagdala og 7.62 kilovolts (kV), 13.2 kV o 23 kV nga kuryente. Pipila sa mga ehemplo mao ang dagko nga komersyal, mga planta ug mga espesyal nga operasyon nga adunay industrial nga load.

PALIHUG AYAW NA PAGLANGAN SA PAGBAYAD SA INYONG BINULAN NGA BALAYRONON SA KURYENTE, KAY ATO NANG GISUGDAN ANG ‘ONE MONTH DISCONNECTION POLICY.”

DAGHAN SALAMAT SA INYONG MAKANUNAYON PAGSUPORTA.

(Information on Energy Sales and Power Rates : Jamie Daisylette Dapal , REE)

WE ARE HIRING –LINE CONSTRUCTION/OPERATIONS AND MAINTENANCE CHIEF Deadline September 13, 2024

LINE CONSTRUCTION/OPERATIONS AND MAINTENANCE CHIEF

DEADLINE OF SUBMISSION : September 13, 2024

JOB OBJECTIVE

● Responsible for the efficient, reliable, and safe operation and maintenance of the transmission and distribution lines, equipment & facilities of the service area.

● Responsible for the accurate, efficient, and safe construction of lines by the accepted standards.

● Responsible for the performance and safety of the personnel of the division.

QUALIFICATIONS

• Graduate with a BS in Electrical or Civil Engineering; preferably a Licensed Electrical/Civil Engineer.

• Adept knowledge and skills in line construction, operation, and maintenance of distribution lines and equipment.

• At least two (2) years of supervisory experience in a related field

• Must have at least (4) years in line construction, operation, and maintenance of the distribution lines and equipment.

• Must have a professional driver’s license.

• A resident of the franchise area.

COMPETENCY REQUIREMENTS

• Good in oral and written communication.

• High integrity and good human relations.

• Outstanding leadership skills in Planning, Leading, Organizing & Controlling (POLC).

• Good problem-solving skills.

• Advanced Computer skills – knowledgeable in MS Office applications and technical software e.g. Synergee, Autocad, etc.

• Demonstrates disciplined and organized work habits.

• Shares the vision and mission of the cooperative, and demonstrates behavior consistent with the cooperative’s core values.

For interested applicants:

Please send your application letter, Resume, and Transcript of Records to

THE HR Manager

Moresco-1 Headquarters,

Laguindingan, Misamis Oriental

or email thru

https://tinyurl.com/MORESCO1Careers

Only qualified applicants will be shortlisted.

Deadline of Submission on September 13, 2024

POWER RATES SA BULAN SA HULYO 2024 MISAKA GIKAN SA PHP 9.9031/KWH NGADTO SA PHP 11.2568 /KWH

PAHIBALO PARA SA MGA PINALANGGA NATONG MGA MEMBER-CONSUMER-OWNERS (MCOs).

ADUNAY PAG-TAAS SA  BALOR UG PHP 1.3536 /kWh SA ATONG “POWER RATES” alang sa atong mga RESIDENTIAL CONSUMERS para sa Billing Month sa HULYO 2024 – – – – PHP 11.2568 /KWH.

Bisan pa adunay pag’ubos sa variable cost sa atong mga IPPs, ang generation cost mi-saka tungud sa kidugang nga 25% staggered payment  (2 of 4) alang sa bulan sa Mayo 2024 nga billing amount alang sa  Independent Electricity Market  Operator of the Philippines (IEMOP), nga mi-resulta  ngadto sa usa ka pagtaas sa generation rate nga PHP 1.1954/KwH.

Aduna usay pagsaka sa atong System Loss Rate nga mukabat ug PHP 0.0557/Kwh. Bisan sa pagtaas sa Generation ug System Loss Rate, anga atong Transmission Charge miubos ngadto sa PHP 0.0182 /kWh.

Kini nga mga makanunayong kausaban mi resulta sa atong effective rate karung bulan sa Hunyo ngadto sa PHP 11.2568 / kWh alang sa mga Residential nga konsumidor.

————————————————–

Sa kasamtangang bahin, kini ang taripa sa uban natong consumers:

On the other hand, Low Voltage has an overall increase of PHP 1.3198/kWh with effective rate of PHP 10.3443/kWh while High Voltage has an overall increase of PHP 1.3729/kWh with effective rate of PHP 9.3482/kWh.

LOW VOLTAGE CONSUMERS – Ang Low Voltage adunay kinatibuk’ang pag-saka ug PHP1.3198 matag KwH nga adunay effective rate balor ug 10.3443/kWh.

Ang LOW VOLTAGE CONSUMERS mao kadtong mga konektado sa kuryente nga gi-tap sa secondary lines sa MORESCO-1 o kadtong mga linya nga molabay human sa mga transformer. Ang mga linya sa low voltage nagdala og rango sa 240 hangtud 480 volts sa kuryente. Pipila sa mga ehemplo mao ang mga gamay nga komersyal, mga street light, ug uban pang mga pampublikong pasilidad

—————————————————————-

HIGH VOLTAGE CONSUMERS – Ang High Voltage adunay kinatibuk’ang pag-saka balor ug PHP1.3729 ug adunay effective rate balor ug PHP 9.3482/kWh ug demand rate PhP 620.8384 / Kw (with VAT).

Ang HIGH VOLTAGE CONSUMERS mao kadtong mga gumagamit nga ang ilang koneksyon sa kuryente gi-tap sa primary lines sa MORESCO-1 o kadtong mga linya nga molabay sa unahan sa transformer. Ang mga linya sa high voltage nagdala og 7.62 kilovolts (kV), 13.2 kV o 23 kV nga kuryente. Pipila sa mga ehemplo mao ang dagko nga komersyal, mga planta ug mga espesyal nga operasyon nga adunay industrial nga load.

PALIHUG AYAW NA PAGLANGAN SA PAGBAYAD SA INYONG BINULAN NGA BALAYRONON SA KURYENTE, KAY ATO NANG GISUGDAN ANG ‘ONE MONTH DISCONNECTION POLICY.”

DAGHAN SALAMAT SA INYONG MAKANUNAYON PAGSUPORTA.

(Information on Energy Sales and Power Rates : Jamie Daisylette Dapal , REE)