WE ARE HIRING – TSA MECHANICAL OPERATION SPECIALIST (DEADLINE OF SUBMISSION: MAY 12, 2025)

TSA MECHANICAL OPERATION SPECIALIST

DEADLINE OF SUBMISSION: MAY 12, 2025

JOB OBJECTIVE

· Maintains Generator operation by completing inspections and preventive maintenance requirements; correcting deficiencies and keeping records.

TASK AND RESPONSIBILITIES

· Evaluate equipment condition by conducting inspections and diagnostic test; identifying worn and damaged parts.

· Perform preventive maintenance and repairs of equipment

· Performs maintenance of Generators, including changing oil and keeping units in good running condition.

· Contains cost by using warranty, evaluating service and parts options.

· Keeps supplies ready by inventorying stock; placing orders and verifying receipts.

· Prepare reports, maintains equipment records.

· Trouble shoots equipment failure.

· Maintains a clean and safe work environment.

· Complies with the technical regulatory requirements mandated by ERC.

· Updates job knowledge by participating educational opportunities;

reading technical and regulations publication.

· Assumes other responsibilities as assigned from time to time

QUALIFICATIONS

· Graduate of Mechanical Engineering Course

· At least one (2) year experience as Diesel Mechanic

· Resident in Franchise Area

FOR INTERESTED APPLICANTS:

Please send your application letter, Resume, and Transcript of Records to

THE HR Manager, Moresco-1 Headquarters, Laguindingan, Misamis Oriental or email thru

https://tinyurl.com/MORESCO1Careers

Only qualified applicants will be shortlisted.

Deadline for Submission on May 12, 2025

Collen B. Tarcelo, PEE Installed as New General Manager of MORESCO-1

LAGUINDINGAN, MISAMIS ORIENTAL | May 2, 2025 — The Misamis Oriental-1 Rural Electric Service Cooperative, Inc. (MORESCO-1), one of the country’s leading electric cooperatives, officially welcomed its new General Manager, Engr. Collen B. Tarcelo, PEE, in a solemn installation ceremony held last Friday, May 2.

The installation was officiated by Atty. Omar M. Mayo, the Deputy Administrator for Electric Cooperative Management Services of the National Electrification Administration (NEA). Engr. Tarcelo, who previously served as the Engineering Services Department Manager of MORESCO-1, now takes the helm of the cooperative with a clear vision of continuing innovation, service excellence, and inclusive growth.

The ceremony gathered the MORESCO-1 family in full force, with the presence of GM Tarcelo’s family, the Board of Directors led by Board President Nonito M. Labis, DVM, and members of the Management Committee and employees. Also in attendance were NEA Board of Administrator (BOA) Jovel B. Ubay-Ubay, PEE, the immediate past General Manager of MORESCO-1, and Past GM Julie B. Real, PEE, who currently serves as the Chief Executive Officer of PACERM-1, an energy generation company.

The occasion marked a significant leadership transition for the cooperative, ushering in a new chapter guided by the values of service continuity, technical integrity, and community empowerment.

Photo Credits: MORESCO-1 HRRD

RESIDENTIAL POWER RATES SA BULAN SA MARSO 2025 ——PHP 11.8006/kWh

Adunay kinatibuk-ang pagsaka sa residential rate nga PHP 0.7110/kWh. Bisan pa nga adunay pagkunhod sa variable charges gikan sa atong mga Independent Power Producers (IPPs), usa sa atong mga nag-unang IPP (Independent Power Producers) — nga nagtugot ug dakong bahin sa atong contracted capacity — miagi ug Scheduled Preventive Maintenance Shutdown (PMS) sukad Marso 1 hangtod 21, 2025. Tungod niini, napugos kita sa pagkuha ug dugang nga kuryente gikan sa Wholesale Electricity Spot Market (WESM), diin mas taas ang presyo tungod sa dako nga demand ug limitado nga supply sa maong panahon.

Gawas pa niini, usa pa ka hinungdan sa pagsaka sa among Generation Rate mao ang pagkunhod sa atong energy sales, tungod kay usa sa atong big-load customers naghinay sa ilang produksiyon. Kini nga mga hinungdan misangpot sa pagsaka sa Generation Rate nga PHP 0.5793/kWh.

Adunay usab pagsaka sa Transmission Charge nga PHP 0.0144/kWh, nga resulta sa pagsaka sa Ancillary Services – Reserve Market Charges sa National Grid Corporation of the Philippines (NGCP), nga maoy naghatag ug backup power aron masiguro ang lig-on ug kasaligan nga supply sa kuryente.

Tungod sa mga kausaban sa rate, ang epektibong rate alang sa Residential Customers kay PHP 11.8006/kWh.

Sa laing bahin, ang Low Voltage adunay kinatibuk-ang pagsaka nga PHP 0.7548/kWh nga nagresulta sa epektibong rate nga PHP 11.0055/kWh,

Low Voltage adunay kinatibuk-ang pagsaka nga PHP 0.7548/kWh nga nagresulta sa epektibong rate nga PHP 11.0055/kWh,

Ang High Voltage nakasinati og kinatibuk-ang pagsaka nga PHP 0.6886/kWh nga nagresulta sa epektibong rate nga PHP 9.7546/kWh.


Giandam ni: Jamie Daisylette S. Dapal, REE; Energy Trading Chief

Infographic giandam sa Corporate Public Relations Office