“The most Blessed Virgin Mary was, from the first moment of her conception, by a singular grace and privilege of almighty God and by virtue of the merits of Jesus Christ, Savior of the human race, preserved immune from all stain of original sin.”
In 1854, Pope Pius IX’s solemn declaration, “Ineffabilis Deus,” clarified with finality the long-held belief of the Church that Mary was conceived free from original sin. Mary was granted this extraordinary privilege because of Her unique role in history as the Mother of God. That is, she received the gift of salvation in Christ from the very moment of her conception.
Even though Mary is unique in all humanity for being born without sin, she is held up by the Church as a model for all humanity in Her holiness and Her purity in her willingness to accept the Plan of God for her.
Every person is called to recognize and respond to God’s call to their own vocation in order to carry out God’s plan for their life and fulfill the mission prepared for them since before the beginning of time. Mary’s “Let it be done to me according to Thy Word,” in response of the Angel Gabriel’s greeting, is the response required of all Christians to God’s Plan. (Source: Catholic News Agency | Solemnity of the Immaculate Conception of the Blessed Virgin Mary)
The Misamis Oriental-1 Rural Electric Service Cooperative, Inc. (MORESCO-1), through its Bids & Awards Committee (BAC) hereby invites interested and eligible bidders to bid for the procurement of MORESCO 1 HEADQUARTERS ROAD CONCRETING .
The project will include the construction of the concreting of road of MORESCO- 1 headquarters entrance road including the sidewalk, speed humps, drainage, sidewalks, signages and other relevant incidental work relevant to the project and will include all taxes and applicable permits, licenses and clearances for the project mentioned above.
DELIVERY PERIOD: 60 CALENDAR DAYS UPON RECEIPT OF NOTICE TO PROCEED (NTP)
DELIVERY SITE/AREA: MORESCO-1 Headquarters, Laguindingan, Misamis Oriental and all other service areas
APPROVED BUDGET COST: P 2, 217, 738.32 inclusive of VAT
SOURCE OF FUNDS: CAPEX
BID DOCS FEE: 5,000.00
ISSUANCE OF BID DOCUMENTS
DEC 7 – 28, 2022
8:00AM – 5:00PM
BAC SECRETARIAT OFFICE, OFFICE OF THE GENERAL MANAGER, MORESCO 1, MAIN OFFICE
PRE-BIDDING CONFERENCE
DEC 14, 2022
9:00AM
MORESCO 1 MAIN OFFICE, LAGUINDINGAN, MIS.OR. or VIA ZOOM
OPENING OF BIDS
DEC 28, 2022
9:00AM
MORESCO 1 MAIN OFFICE, LAGUINDINGAN, MIS.OR. or VIA ZOOM
BAC EVALUATION
DEC 28, 2022
BAC
POST QUALIFICATION
DEC 29 – JAN 5, 2023
BAC
NOTICE OF AWARD
4th Week of JANUARY 2023
BAC, MANAGEMENT
The scope of technical requirements or specifications are outlined in the Bid Documents to be provided to all interested bidders upon application addressed to the Chairman of Bids and Awards Committee and payment of the corresponding bid fee as stated above.
The project shall be bid in accordance with the provisions of R.A. 10531.
Attendees to the pre-bid conference are only the prospective bidders who have bought bid documents, or their authorized representative (duly notarized).
Bidders shall submit samples as required. BAC thru TWG, with proper labelling and accompanied by delivery receipt.
Bid Security must be 2% of the Approved Budget of the Contract (ABC) in the form of cash, cashier’s check or manager’s check and Bank Guarantee only.
MORESCO-1 hereby reserves the right to waive any formality in the responses, accepts or rejects any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or party.
For queries, please contact the BAC Secretariat (0917-720-0893), look for Ms. Cinderella A. Eballe or email us at bac@moresco1.com
PAHIBALO PARA SA TANAN NATONG MGA MEMBER-CONSUMER-OWNERS (MCOs) — MAO KINI ANG ATONG “POWER RATES UPDATE” alang sa atong mga RESIDENTIAL CONSUMERS para sa Billing Month sa Nobyembre 2022 —- Php16.3663 /kWh.
Adunay pagsaka sa presyo sa kuryente balor ug Php 0.60 kada kWh (Alang sa mga Residential Consumers) tungod kay ang Generation Rate misaka usab. Sa samang bahin, tataw kayo nga naapektohan sa maong pagsaka ang nagpabilin nga galastohan (variable costs) sa Generation ug IPP suppliers tungud sa pagtaas sa fuel (coal ug diesel) nga mahimong sugnud sa pagmugna sa gahum sa elektrisidad.
Gusto natong ipahinumdom sa tanang mga MCOs nga ang taripa sa MORESCO-1 striktong ginapasubay ug gina-regulate sa Energy Regulatory Commission (ERC). Maong ang atuang Power Bill Computation naka-base sa mga balaud nga gina-pagawas sa ERC, kung diin:
GENERATION, TRANSMISSION ug GOVERNMENT CHARGES– Ihan-ay kini isip mga “Pass-Through Costs”. Ang breakdown sa Generation Rates | costs kada-tuig atong makita sa atong MORESCO-1 Website – https://mor esco1.com/category/generation-charges/
Tungod kay ang MORESCO-1 usa ka non-stock, non-profit, service oriented nga kooperatiba sa serbisyo sa kuryente, dili kita pwede magpa-tubo or magka-profit. Kung unsa gayud ang tinuod ug tataw nga palit sa pag-angkat sa kuryente gikan sa mga Power Generation Companies, mga gasto sa atong pag-gamit sa mga High Voltage Power Lines sa NGCP para maabot ang gipang-angkat nga kuryente ni MORESCO-1 sa iyang mga substations ug ang buluwisan sa kuryente, mao lamang sab ang sukton ug walay bisan pila ka sentimo nga nadugang.
2. DISTRIBUTION CHARGE— Kini mao ang galastohan sa pag-apud-apud sa kuryente nga mupa-ingon sa atuang MORESCO-1. Isip usa ka non-stock, non-profit, service oriented nga kooperatiba sa kuryente, ang taripa dili pwede magpa-ginansya, dapat igu lamang para sa atuang Operation, Maintenance ug Capital Expenditure Projects. Kini naka-basi sa ERC Rules for Setting Electric Cooperatives’ Wheeling Rates (RSEC-WR).
Kung tan-awon ang pag-taas sa taripa nga mukabat Php 0.6028 kada kWh alang sa mga residential customers gi-detalye sa mosunod:
Generation Rate MISAKA balor ug Php 0.3352 /kWh
Systems Loss Rate MISAKA balor ug Php 0.4499 /kWh – kadtong mga “SYSTEM LOSS ADJUSTMENTS” nga makita sa atong mga power bill kaniadto isip automatic recovery balor ug P0.3626 gi-undangan na, mao nga ang System Loss na mahi-apil sa imong power bill sukad karun mao na gayud ang ACTUAL SYSTEM LOSS sa MORESCO-1.
Mi’resulta sa atong effective residential consumer rate balor ug Php16.3663/kWh.
LOW VOLTAGE CONSUMERS – Ang Low Voltage adunay kinatibuk’ang pag-saka ug 0.6125 nga adunay effective rate balor ug Php15.3869 /kWh.
HIGH VOLTAGE CONSUMERS – Ang High Voltage adunay kinatibuk’ang pag-saka ug 1.1646 ug adunay effective rate balor ug Php15.1851/kWh.
ATONG MAKITA SA ATONG ELECTRIC BILL NGA ANG KAUSABAN SA ATUANG TARIPA SA KURYENTE SA MATAG BULAN GAAGAD LAMANG SA ACTUAL NGA KAUSABAN SA MGA PASS-TROUGH COSTS NGA GILANGKUBAN SA GENERATION, TRANSMISSION, UG GOVERNMENT CHARGES.
DAGHANG SALAMAT SA INYONG MAKANUNAYON NGA SUPORTA, KA-MORESCO-1!