ENGR. EDGAR G. BUHIAN, RE-ELECTED DIRECTOR FOR MORESCO-1’S DISTRICT 4-INITAO

Edgar Galarpe Buhian, a Geodetic Engineer by profession and currently running his own survey and geodetic service business and managing a agriculture training facility in Initao, Misamis Oriental was re-elected yesterday, June 3, 2023 in Initao National Comprehensive High School.

Married to Nemia Penita Aubal and currently resides at Purok 9, Poblacion, Initao, Loloy, as he is called by friends and relatives is a member-consumer-owner (MCO) of MORESCO-1 since 1997.

He used to work with the Department of Environment and Natural Resources (DENR) Region 10.

A lone candidate of the district, he was inducted to the office by the District Election Committee (DECOM) composed of Chairman Anthony Y. Pacamalan; Secretary Ric D. Gabe; and Marcel Tagalogon in the presence of the MORESCO-1 BOD President Director Nonito M. Labis, GM Jovel B. Ubay-ubay, and Service Area Managers Marlon P. Gunita and Jojiepril Legaspi.

District elections in MORESCO-1 are run by the DECOM and the Service Area Offices holding jurisdiction over the district, logistically managed by the Institutional Services Department team of M1, supervised and monitored by the National Electrification Administration (NEA).

UPI ADVISORY –PAGAWAN SUBSTATION (JUNE 2, 2022 AT APPROX 13:55HS)

For the information of all concerned MCOs —– The Unscheduled Power Interruption experienced by those that are connected to Pagawan Substation in Manticao was caused by NGCPs Automatic Load Dropping due to the outage of Generation yesterday, June 2, 2023 approximately 13:55hs.

BELOW IS NGCP’S MESSAGES TO MORESCO-1

WEBSMS- SMS RefNo.:130923 IACC-06/02/2023 14:40: IACC 69kV feeders on ALD affected by the outage of FDC Unit 1 (92.8MW) at 1355H are the ff:

  1. Manolo-Lunucan (TR-1422H, 20.38MW),
  • Lugait-Pagawan (restored at 1413H, 4.13MW), – AFFECTED AREAS: ENTIRE MANTICAO, ENTIRE NAAWAN, ENTIRE LUGAIT, LIMONDA OPOL, HINDANG ILIGAN CITY, PONTACON AND PAGAHAN INITAO
  • Agus6-Kauswagan (restored at 1419H, 3.92MW), and
  • Marawi-Baloi (restored 1417H, 24.2MW).
  • CEPALCO’s VIllanueva Feeder 1 restored at 1405H with 3.01MW load.

If there are any concerns, please feel free to reach us at our MORESCO-1 24-HOUR CUSTOMER SERVICE HOTLINE: FOR CALLS ONLY : GLOBE 09177948314 SMART 09498892047 FOR TEXT ONLY : GLOBE 09173258560 SMART 09209558560 FB PAGE: https://www.facebook.com/moresco.one

Please be informed accordingly.

LSA COLLECTION DRIVES | ENGAGEMENT ADVISORY(STARTED MAY 30, 2023)

In line with our Collection Drive engagements, the Laguindingan Service Area would like to inform the member-consumer-owners and the general public that MORESCO-1 paying stations at Laguindingan and Alubijid will be open every Saturday, whole day which already started last May 20, 2023 with the following schedules.

Laguindingan Tellering Office
08:00 AM – 04:00 PM

Alubijid Paying Station
08:00 AM – 04:00 PM

Thank you very much.