NOTICE OF BIDDING – BAC CONTROL NO. BAC-ITB-2025-12-07 – Publication Date: December 26, 2025 -SEP / BLEP / EPTC

MISAMIS ORIENTAL – 1 RURAL ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO-1)
Laguidingan, Misamis Oriental

NOTICE OF BIDDING

BAC CONTROL NO. BAC-ITB-2025-12-07
Publication Date: December 26, 2025

The Misamis Oriental-1 Rural Electric Service Cooperative, Inc. (MORESCO-1), through its Bids and Awards Committee (BAC), invites all interested, eligible, and reputable suppliers, contractors, and bidders to participate in the public bidding for the following procurement projects:


Approved Budget for the Contract (ABC): PHP 12,460,000.00
Bid Fee (Non-refundable): PHP 25,000.00

Scope includes, but is not limited to:

  • Meter 10(60) A Bottom Infra Red
  • Meter 15(100) A Socket Infra Red
  • Wall Mounted Outdoor Enclosure Box
  • kWh Meter Power Transformer DB2-04-2, 1-Phase, 240V
  • LCD Type kWh Meter with accessories

Delivery Period: 30 days upon receipt of Notice to Proceed


ABC: PHP 14,876,175.18
Bid Fee (Non-refundable): PHP 25,000.00

Scope includes:

  • Provision of labor manpower services for Customer Driven Distribution Line Construction

Delivery Period: Starting January 1, 2026


ABC: PHP 4,640,979.00
Bid Fee (Non-refundable): PHP 5,000.00

Scope includes:

  • Distribution Line Materials
  • Installation of kWh Meters and Service Assembly Units
  • Duplex Service Drop Wires
  • Housewiring materials for One Hundred Sixteen (116) households

Delivery Period: 30 days materials delivery, 30 days construction


ABC: PHP 51,018,960.00
Bid Fee (Non-refundable): PHP 50,000.00

Scope includes:

  • Distribution Line Enhancement Works
  • Supply and Installation of KWh Meters, Service Assembly Units, Duplex Service Drop Wires
  • Housewiring for Seventy-Nine (79) Connections

Delivery Period: 45 days materials delivery, 90 days construction


BIDDING SCHEDULE AND ACTIVITIES ( Refer specific projects to the attached infographic)

ActivityDateTimeVenue
Issuance of Bid DocumentsDecember 26, 2025 – January 14, 20268:00 AM – 5:00 PM until before openingBAC Secretariat Office, Office of the General Manager, MORESCO-1 Main Office
Pre-Bidding ConferenceJanuary 2, 20269:00 AMMORESCO-1 Main Office, Laguindingan, Mis. Or. or via Zoom
Opening of BidsJanuary 13–14, 2026 (depending on project schedule)9:00 AMMORESCO-1 Main Office or via Zoom
BAC EvaluationJanuary 13–14, 2026BAC Office
Post QualificationJanuary 14–19, 20261:00 PMBAC Office
Notice of Award1st Week of February 2026BAC Management

BID REQUIREMENTS

  • Purchase of Bid Documents and submission of Letter of Intent
  • Attendance to Pre-Bidding Conference (only to those with purchased bid documents or duly notarized representatives)
  • Bid Security equivalent to 2% of ABC (Cash/Cashier’s or Manager’s Check/Bank Draft/Guarantee/Credit Line issued by Universal or Commercial Bank)

MORESCO-1 reserves the right to waive formalities, reject any or all bids, annul the bidding process, or declare a failure of bidding without incurring liability to any affected bidder or party.

For inquiries, please contact the BAC Secretariat at
0917-720-0893 or email bac@moresco1.com


JOGIE PRIL LEGASPI, PEE
BAC Chairman

ENGR. COLLEN B. TARCELLO, PEE
General Manager

SURNECO Seeks MORESCO-1 Support for Post-Qualification Verification of 20 MVA Substation Project

Laguindingan, Misamis Oriental — The Surigao del Norte Electric Cooperative, Inc. (SURNECO), through its Technical Working Group (TWG), has formally requested the assistance of the Misamis Oriental I Rural Electric Service Cooperative, Inc. (MORESCO-1) in conducting a Post-Qualification Verification Activity related to its ongoing 20 MVA Substation Project in Barangay Ipil, Surigao City.

In a request letter addressed to MORESCO-1 General Manager Engr. Collen Tarcelo, SURNECO sought permission to conduct the verification activity at MORESCO-1 on December 16, 2025, as part of the mandatory post-qualification process under the Electric Cooperatives Procurement Guidelines, pursuant to NEA Memorandum No. 2017-019.

The post-qualification verification aims to verify and validate the technical capability and performance of Yueqing Chi Fu Company Inc., the supplier under consideration for SURNECO’s substation project. The company previously completed a substation project implemented for MORESCO-1, making the cooperative a relevant reference site for assessment.

According to SURNECO, the activity will involve site inspection, document verification, and interviews with concerned MORESCO-1 personnel who were directly involved in the completed substation project. These steps are intended to ensure compliance with procurement standards and to uphold transparency and accountability in the bidding process.

SURNECO further assured MORESCO-1 that its Technical Working Group would strictly observe coordination protocols and undertake the verification in a manner that will not disrupt normal cooperative operations.

The request was noted by Engr. Michael J. Lumancas, Chairman of the SURNECO Bids and Awards Committee (BAC), underscoring the importance of inter-cooperative collaboration in strengthening governance and technical due diligence within the electric cooperative sector.

MORESCO-1’s cooperation in this activity is expected to significantly support SURNECO in completing its post-qualification requirements efficiently, reinforcing shared commitments to sound procurement practices, regulatory compliance, and reliable power infrastructure development.

GENERATION CHARGES BREAKDOWN — NOVEMBER 2025

Arun klaro sa atong mga member-consumer-owners (MCOs) ang breakdown sa atong balayranan sa generation matag bulan karung tuiga ug sa umaabot, ania ang binulan nga “Breakdown of Generation Rates” o ang atong balayrunon sa kuryente ngadto sa mga independent power producers (IPP) o generation (suppliers) nga atong gi-angkatan sa kuryente niadtong bulan sa Nobyembre 2025.

Gimando sa Energy Regulatory Commission (ERC) ang tanan distribution utility sa tibuok nasud sa istrikto nga pag-paskin sa binulan nga generation rates breakdown sa tanang planta diin nag-angkat kini sa enerhiya | kuryente.

Kini arun makita sa tanan konsumidor sa kuryente asa gayud ang dako ug pahat sa charges sa sa tanan players sa paghimo, pakutay ug pag-apud’apud sa gahum dagitab.

Ang MORESCO-1 adunay takus sa pagpili sa kung kang kinsa nga IPP mukuha ug kuryente alang sa iyang distribution feeds arun maka-minimize sa monthly power rates niini.

Daghang salamat.