Please be informed that there will be power service interruption as indicated in the schedule/s below:

Scheduled Power Interruption

Date & TimeAffected AreasReason
5:30AM – 7:00AM
and
4:30PM – 6:00PM

•Youngsville Subdivision
•Igpit
•Entire Baikingon
•Portion of Sili-Sili Pagatpat
•Entire Taboc
•Malanang
•Barra
•Portion of Poblacion, Opol (Zone 2)
•Entire Canitoan
•Zone 1 – 8 Scions
•Gokingville
•Assumption Village
•Cerritos Camella
•Bellevue
•Oro Vista
•Familia Apartment
•Bamboo Lane
•Forestview Homes
•San Agustin Valley Homes
•West Woods Village
•PN Roa
•Canitoan Relocation Site
•San Simon
•Portion of Pagatpat

NGCP Scheduled Power Interruption: To facilitate pole replacement and installation of metering for Opol-Patag 69 kV line
5:30AM – 1:00PM and
4:30PM – 6:00PM
•Portion of Patag, Opol (After Sub-station)
•Entire Awang
•Entire Bagocboc
•Entire Tingalan
•Entire Nangcaon
NGCP Scheduled Power Interruption: To facilitate sub-station preventive maintenance
5:30AM – 6:00PM•Portion of Patag, Opol (Before Sub-station)
•Entire Bonbon
•Entire Luyong Bonbon, Opol
•Entire Molugan
•Entire Amoros
•Entire Sambulawan
•Entire Himaya
•Entire Taytay
•Portion of Ulaliman
•Portion of Poblacion, Opol (Zone 1, 3, 4, 5, 6, 7)
NGCP Power Interruption: To facilitate sub-station preventive maintenance
5:30AM – 6:30AM and
4:30PM – 5:30PM
•Entire Libertad District
•Entire Gitagum District
•Entire Laguindingan District
•Entire Alubijid District
•Entire El Salvador District
•Lasang, Initao

TALAKAG AND CDO DISTRICT
•10 Barangays of Cagayan de Oro
•Cabula
•Lumbia
•Pualas
•Maasin
•Nicdao
•Baungon, Bukidnon
NGCP Scheduled Power Interruption: To facilitate equipment installation at NGCP Opol sub-station (Switching procedure)

Switching Procedures
5:30AM – 12:00PMLAGUINDINGAN DISTRICT
•Portion of Purok 1 Gasi
•Portion of Poblacion
•Entire Sinai
•Entire Sambulawan
•Entire Mauswagon
•Entire Tubajon
•Purok 4, Liberty

GITAGUM DISTRICT

•Entire Poblacion
•Entire Cogon
•Entire Talao
•Portion Burnay
•RIDE ON ACTIVITY TO NGCP SCHEDULED POWER INTERRUPTION:
1. To facilitate the replacement of cracked pole at Poblacion, Gitagum
2. 1.To install gecko preventive device at Sambulawan, Laguindingan
5:30AM – 5:30PMEL SALVADOR DISTRICT
•Portion Sinaloc and Portion Poblacion

TALAKAG AND CDO DISTRICT
•17 Barangays of Talakag, Bukidnon
•Mindanao Talakag Steel Corporation (MTSC)
•Sobros and Besigan, Cagayan de Oro City
•RIDE ON ACTIVITY TO NGCP SCHEDULED POWER INTERRUPTION:
1. To facilitate retirement of unused pole at Doyugan, Sinaloc, El Salvador

•To facilitate pole replacement and installation of metering for Opol-Pataag 69kV line by NGCP crew and preventive maintenance at Talakag Sub-station by MORESCO-1

Power will be restored once the activity is completely executed and not necessarily following the above-stated schedule.